Update and Photo Archive

April 2015

  • Selective Demolition/Remediation of the Administration Building is:
    • In progress on the
      • South side of 2nd floor
      • South side of 1st floor
      • Ground floor
    • Complete in all other areas
  • Power House abatement is scheduled to begin once the Administration Building is complete.

Administration Building – 4th Floor

ab-4th fl-south-c wing

Administration Building – 3rd Floor

ab-3rd fl-north-ab wing

Administration Building – 2nd Floor

ab-2nd fl-north-b wing  ab-2nd-fl-north-a wing-001

Powerhouse Basement

Powerhouse Basement Tunnel  Powerhouse Basement Pump Room1 Powerhouse Basement Pump Room  Powerhouse Basement Boiler Room

March 2015

  • Selective Demolition/Remediation in the Administration Building is:
    • In Progress on the:
      • Ground floor
      • South side of 1st and 2nd floors
    • Scheduled for April on the north side of 1st and 2nd floors
    • Complete in all other areas

Administration Building – 3rd Floor

AB3North AB3South AB3South1

Administration Building – 2nd Floor

AB2South AB2South1

Administration Building – 1st Floor

AB1South AB1South1

February 2015

  • Selective Demolition/Remediation of the Administration Building is:
    • In progress on the
      • 3rd floor
      • North and south sides of 2nd floor
      • North and south sides of 1st floor
      • Ground floor
      • Basement
      • Stairwells
    • Complete in all other areas

Administration Building – 6th Floor

001  002 003  004

Administration Building – 5th Floor – Mezzanine

005  006

Administration Building – 5th Floor – South End Overview

007  008

Administration Building – 5th Floor – Overview

009  010

Administration Building – 5th Floor – North End Overview

011  012

Administration Building – 5th Floor – Center Area

013

Administration Building – 5th Floor – Elevator Lobby

014

Administration Building – 4th Floor – North End Overview

015

Administration Building – 4th Floor – Elevator Lobby

016

Administration Building – 4th Floor – South End Overview

017  018

Administration Building – 3rd Floor

019  020 021  022 023  024

January 2015

  • Selective Demolition/Remediation of the Administration Building is:
    • In progress on the
      • 3rd floor
      • North and south sides of 2nd floor
      • North and south sides of 1st floor
      • Ground floor and stairwells
    • Complete in all other areas
  • Selective demolition is complete in the Service Building.

Administration Building – 5th Floor

001  002 003  004 005

Administration Building – 4th Floor

006  007 008  009 010  011 012

Administration Building – 2nd Floor

013  014 015 016

Administration Building – 1st Floor

018  019 020  021 022

023 024

November 2014

  • Abatement in the Administration building is:
    • Complete in the basement, 5th and 6th floors
    • 4th floor is 90% complete
  • Service Building abatement is complete.
  • Selective demolition in the Administration building is:
    • 90% complete in the basement
    • 60% complete on the 5th floor
    • Complete on the 6th floor

4th floor demolition

4th floor demo pssc 014 4th floor demo pssc 012 4th floor demo pssc 006

5th floor demolition and abatement

5th floor demo and abatement 100_1309 5th floor demo and abatement 100_1303 5th floor demo and abatement 100_1297

October 2014

  • Mayor Michael A. Nutter and City officials broke ground on the new Philadelphia Public Safety Services Campus. (Click here for more information).
  • Abatement in the Administration building is now complete in the basement.
  • Abatement is 90% complete on the 5th and 6th floors.
  • Fourth floor is being prepared for abatement.
  • Service Building abatement is 60% complete.
  • Selective demolition is occurring in the basement and on the 5th floor of the Administration building.
  • Exterior Building assessment is complete.
  • Interior assessment will occur as floors are cleared for asbestos.

safety meeting and groundbreaking prep october 20th 037 Groundbreaking 027 Groundbreaking 026 Groundbreaking 029 Groundbreaking 028 Groundbreaking 023 safety meeting and groundbreaking prep 001 safety meeting and groundbreaking prep 002 safety meeting and groundbreaking prep october 20th 035

September 2014

  •  Selective Demolition and Abatement began and will be completed early 2015. Onsite Professional Inspectors enforce that all work is being performed in a safe manner and according to regulations.
  • Building Assessment was completed. Architects and engineers used cranes and high-reaches to survey the entire exterior facade using laser scanning and radar technology to verify and document existing conditions.
  • Tree/Landscape Assessment began. Landscaping assessment and tree removal required for surveying was completed.  Maintenance continues as required.

August 2014

STV-Pic for Website-19SEP14-7 STV-Pic for Website-19SEP14-4

STV-Pic for Website-19SEP14-2 STV-Pic for Website-19SEP14-6

STV-Pic for Website-19SEP14-5 STV-Pic for Website-19SEP14-3